FirefightersWater supply connections
As a member of a team, with supply or intake hose, hose tools and a fire hydrant or a static water source, you connect a fire department pumper to the water supply, with tight connections and an unobstructed water flow. It is station 4-18 of Ohio's Firefighter I practical exam (NFPA 1001 4.3.15).
Free to startScenarios
- Hydrant to pumper.
- Drafting from a portable water tank.
- Drafting from a static source, such as a pond or a creek.
The steps
- Hydrant to pumper: lay a supply hose by hand in a forward or reverse lay.
- Hydrant to pumper: make the hydrant-to-pumper hose connections.
- Hydrant to pumper: fully open and close the hydrant.
- Drafting: connect and place the hard suction hose.
- Drafting: direct the deployment of the portable water tank or other static water source.
- Drafting: direct the deployment of the equipment needed.
- No unsafe act during the evaluation.
To pass
- All 4 steps of the operation you do: the 3 of hydrant to pumper or the 3 of drafting, and no unsafe act.
- With a single portable tank, there is no need to set up the equipment to move water from one tank to another.
- Team members follow the directions of the candidate being evaluated.
- The evaluator can stop the station at any time for an unsafe act.
Official source
Firefighter I Practical Examination Skill Sheets (EMS 5919)
Ohio publishes every Firefighter I skill sheet free: the steps, the critical points and the minimum to pass.
Making Synapses is not affiliated with, sponsored by or endorsed by NFPA, IFSAC, Pro Board, OSHA or any state agency. NFPA 1001 and NFPA 1010 are trademarks of their respective owners and are named only to describe the exams.