SpaceA trained and rested team for the countdown shift

The people on the countdown hold safety-critical tasks, and the federal launch rule asks two things of each of them: training that is current, and rest. You build the countdown roster: who is qualified for each task, how long each shift runs, how many days in a row are allowed and the rest everyone gets right before the flight countdown shift.

Free to start

Scenarios

  • The countdown shift comes at the end of several work shift days in a row.
  • A delay asks for one shift to be extended.
  • The training of one person on a safety-critical task is no longer current.

The steps

  1. List the safety-critical tasks of the countdown that need qualified personnel.
  2. For each person on those tasks, confirm they are trained, qualified and capable, and that their training is current, using the process that tracks training currency.
  3. Check the length of each work shift and the process to extend it, without going past the maximum length allowed for any extension.
  4. Count the consecutive work shift days allowed before rest is required.
  5. Give the minimum rest between work shifts, including the rest required right before the flight countdown work shift.
  6. After the maximum number of work shift days, give the minimum rest required.
  7. Send any deviation from the rest rules through its approval process before the shift.

Safety rules that stop the station

  • Rest rules exist so every person on a safety-critical task is physically and mentally capable of every task assigned.

To pass

  • Every safety-critical task covered by a trained, qualified and current person.
  • The rest before the countdown shift given, and no shift or extension past its limit.
  • Every deviation from the rest rules approved through its process.

Official source

Federal · FAA, 14 CFR 450.149 and 450.151

14 CFR Part 450, Launch and reentry license requirements

GovInfo publishes 14 CFR Part 450 free: 450.149 sets the training and currency of safety-critical personnel and 450.151 the work shift and rest rules, including the rest before the countdown shift.